Now that most all (the Old Ceiling Drywall is still intact) the Demo has been completed, it it time to begin the reconstruction aspect of a redesigned layout. Here the Temporary support walls are constructed to support the removal of the Bearing Wall and the insertion of a bearing support beam that will reside above the ceiling.